Building a Systems Development Team - Management

The CPM (Critical Path Method) of project management is very commonly used in the management of construction projects.

Steve Jost Profile Picture
Share
Contributors Chris Hodge David Brown

The Critical Path Method works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single-value delivery event, such as the completion of a building, or in major phases, such as turning over a floor at a time.

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan, and CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear, even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations, more agile management methods are required either in conjunction with or to replace CPM. This is especially true when managing Systems Development Teams

There are similarities between all methods. Develop the systems that work best for your company at this point in time.

This is Part 7 of an 18-Part Series


Topics Covered in the Series Include:

  • Developers
  • Mistakes
  • Robotics
  • Workflow
  • Support

All relationships start with a simple conversation. Let’s schedule some time to talk about your specific challenges and opportunities.


Building a Systems Development Team - Management
Construction technology innovation is accelerating and the contractors that learn how to effectively integrate technology into every aspect of their business will dominate tomorrow. ...

Building a Systems Development Team - Management
Construction technology innovation is accelerating and the contractors that learn how to effectively integrate technology into every aspect of their business will dominate tomorrow. ...

PICK SMART Improvements
Contractors will never have enough resources to solve all problems or take advantage of every opportunity they face. There are a couple tools that can be used to align the team around the best utilization of resources:
Labor Productivity - How Much Could You Save?
Winners of the construction labor productivity is a game focus on minutes and seconds looking at ways to eliminate waste. There are 480 minutes in an 8 hour shift. Typically only 307 of them are spent installing material. What are 10 minutes worth?
Business Development Models for Contractors
There are two primary models that contractors use for developing business. Often the best approach for sustainable growth is integrating the "Seller-Doer" and "Business Developer" models.